Checking for non-preferred file/folder path names (may take a long time depending on the number of files/folders) ...
This resource contains some files/folders that have non-preferred characters in their name. Show non-conforming files/folders.
This resource contains content types with files that need to be updated to match with metadata changes. Show content type files that need updating.
Authors: |
|
|
---|---|---|
Owners: |
|
This resource does not have an owner who is an active HydroShare user. Contact CUAHSI (help@cuahsi.org) for information on this resource. |
Type: | Resource | |
Storage: | The size of this resource is 1.6 KB | |
Created: | Feb 08, 2023 at 2:33 p.m. | |
Last updated: | Feb 08, 2023 at 2:34 p.m. | |
Citation: | See how to cite this resource |
Sharing Status: | Public |
---|---|
Views: | 742 |
Downloads: | 213 |
+1 Votes: | Be the first one to this. |
Comments: | No comments (yet) |
Abstract
In Pakistan, groundwater contributes about 40% in total water resources of the country and is considered a great source of fresh water which plays vibrant role in sustainability of irrigated agriculture. It is critical to safe and properly manage groundwater resources of the country for sustainable use. To ascertain groundwater potential areas and current status of the aquifer in the Upper Thal Doab, a part of Indus Basin in the Punjab Plain, an integrated approach of remote sensing (RS), Geographic Information System (GIS), and groundwater modeling has been adopted. Different input data sets like, geology, geomorphology, rainfall, land use/land cover, elevation, and drainage were overlaid and weighted to prepare groundwater potential zones map. The results classify the groundwater potential zones into three categories: good, moderate, and poor. The results demonstrate that about 12% of the study area is designated as good, 27% moderate, and 61% as poor. The groundwater modeling of the area was also carried out to find the current status of the aquifer, favorable sites for groundwater and predict future scenarios. The steady-state model was calibrated with the hydrological conditions of 1984 when the hydraulic heads were appeared to be in equilibrium condition. Transient simulations were calibrated for six stress periods with varying lengths commencing from 1985 to 2025. The mass balance analysis for transient model shows that the total outflows gradually increases than inflows from 1991 onwards due to increase in water extraction through water wells. The results demand to conduct periodic studies of the area to monitor the groundwater resources depletion if any in due course of time for timely management and precautionary measures.
Subject Keywords
Coverage
Spatial
Content
Additional Metadata
Name | Value |
---|---|
DOI | 10.1007/s12517-019-4783-4 |
Depth | |
Scale | 10 001 - 100 000 km² |
Layers | 1 |
Purpose | Groundwater resources |
GroMoPo_ID | 273 |
IsVerified | True |
Model Code | Unknown |
Model Link | https://doi.org/10.1007/s12517-019-4783-4 |
Model Time | 1985-2003 |
Model Year | 2019 |
Model Authors | Rehman, HU; Ahmad, Z; Ashraf, A; Ali, SS |
Model Country | Pakistan |
Data Available | Report/paper only |
Developer Email | haneef_sgs@yahoo.com; fz97@hotmail.com; mashr22@yahoo.com |
Dominant Geology | Model focuses on multiple geologic materials |
Developer Country | Pakistan |
Publication Title | Predicting groundwater potential zones in Upper Thal Doab, Indus Basin through integrated use of RS and GIS techniques and groundwater flow modeling |
Original Developer | No |
Additional Information | |
Integration or Coupling | |
Evaluation or Calibration | Dynamic water levels |
Geologic Data Availability | No |
How to Cite
This resource is shared under the Creative Commons Attribution CC BY.
http://creativecommons.org/licenses/by/4.0/
Comments
There are currently no comments
New Comment